USF to begin construction on new student wellness center

This entry was posted in News on by .


The $27.4 million facility is student-funded and will be four times the size of the existing health services building.

Read More.

University of South Florida administrators and students donned hardhats and shovels Tuesday to mark the start of construction on a new, long-planned student wellness center.

The three-story, 47,000-square-foot building will be four times the size of the existing Student Health Services building on the Tampa campus. It will be built using $27.4 million from a student-paid fee for capital improvements.

Dr. Joseph Puccio, executive and medical director of USF Student Health Services, said when he first came to the university in 2011, he had a five-year plan to expand medical services offered on the growing campus and better train students entering the medical field. But the former building, constructed in 1980, made that difficult to accomplish.

Publisher: www.msn.com
Reference: Visit Source (Read Article)

Other things to check out:

USF to begin construction on new student wellness center

The new building, he said, will allow multiple health services to be housed under the same roof and better serve students. ‘This past year we showed how desperately we needed this,’ Puccio said.

The new facility, located in what is now a parking lot off Genshaft Drive near the recreation center and the Yuengling Center, will offer general medical and urgent care services. Students also will have access to psychiatry, behavioral health, nutrition, dermatology and gynecological and sexual health services. In addition, the building will house a laboratory and pharmacy.

USF president Steve Currall said the pandemic brought added attention to the importance of health. The new center, he said, would better equip the university to support the physical, mental and emotional health of students.


Publisher: Tampa Bay Times
Author: Tampa Publishing Company
Twitter: @TB_Times
Reference: Visit Source (Read Article)

USF Football Unveils ‘Phase 1’ Of Facility Improvements, Including Indoor Performance Facility

“It’ll be an 88,000 square-foot facility. It will encapsulate an entire football field, be climate controlled and have a wonderful lobby and observation deck,” said Kelly. “It’ll be used obviously for football, for all of our athletic teams, for practice, and for performance training.”

* * *

Phase one also includes $3 million worth of renovations to the football section of the Lee Roy Selmon Athletics Center. Kelly said it will be the first major renovation of the football section since the building was built in 2004.

“It will make enhancements to the team meeting room ‘ a meeting room that all of us at USF athletic uses, and a total renovation in the locker room to create not only a better facility for our student athletes, but also a lounge space, a nutrition area, and everything that our football team needs in our existing facility for the time being,” he said.


Publisher: WUSF Public Media
Date: 2021-02-25T18:13:56.794
Author: Author link
Twitter: @wusf
Reference: Visit Source (Read Article)

Video